Today was jaw dropping! Every Pobot had a job to do, and every machine was in use. Bottle-necking did happen to occur when CAD Drawings weren't being pumped out fast enough, however teammates banded together to get those out. Now we have plates and brackets galore ready to be milled, drilled, and placed into spaces that need to be filled. We all like what we're seeing.
Wish us luck!
The POBots!
Pobots Progress Report
2/3/18
David Zaretsky
Elevator
Zach Meyer
David Zaretsky
Preparations made to begin mounting Elevator to Chassis.
Mounting began under Zach
Plates and mounting blocks created by David, Max, and Jake
Climber
Aaron Waltzer
Flyin’ Solo
Large ‘L’ Plates made for climber
Plates being milled to proper size
Intake
Josh Ziesel
Flyin’ Solo
Milling out holes for assembly
Plans made to mount onto robot
Comments