The Elevator is looking great! That's it! We assembled, we evaluated, we will continue to assemble. It's the middle of week four, and the middle of our school year. Some of us are having major schedule changes, and others are changing their tune. Anybody who doubted us having a clear shot into nationals, we wag our collective fingers in their general direction. It's hard to keep the titles coming, all of our creativity has been poured into our Chairman's essay. However, we will never stop striving to be better.
Wish us luck!
-The POBots
Pobots Progress Report
1/31/18
David Zaretsky
Elevator
Zach Meyer
Jake Shulroff
Assembled the recently machined pieces of 80/20 with our bearing brackets, and numerous L Brackets
After initial assembly, evaluations were made to determine design optimizations.
Any pieces produced with imperfections will be remade to fit club standards
Climber
Aaron Waltzer
Name of Secondary
Manufactured supports for climber
Delrin shipment received and processed
Full climber production is a go.
Constitution
Lily Garfinkel
Colby Kusinitz
Reformatting Constitution
Making edits to prevent over-complications/confusion from a lack of description
Comments